89

Is it a about money? Is it a bragging rights thing? Is it a leftover of years gone by?

top 40 comments
sorted by: hot top controversial new old
[-] crsu@lemmy.world 51 points 7 months ago

Depends but possibly freight and logistics cycles.

[-] FlyingSquid@lemmy.world 20 points 7 months ago

I would think so. The sooner you can get widgets shipped out, the sooner they get distributed. 5 am is earlier than 8 am.

[-] SkyezOpen@lemmy.world 12 points 7 months ago* (last edited 7 months ago)

In that case, why wait for the next day? Start Tuesdays work on Monday and ship a whole day early.

[-] Earthwormjim91@lemmy.world 15 points 7 months ago* (last edited 7 months ago)

That does happen. Most long haul freight is done overnight so that there’s less traffic and the trucks can be more efficient with time.

Short to medium haul freight needs to get the finished product from the factory to the distribution centers for the long haul freight to pick it up.

Also, most production factories are 24/7 anyway. Usually you have 5-1, 1-9, and 9-5.

[-] RiderExMachina@lemmy.ml 45 points 7 months ago

If they are 12 hour shifts, so that the people can head home at 5 with everyone else. If they are 8 hour shifts, usually for the later shifts to have an okay life balance: 5-2 for day shift, 2-11 for second shift, and a third shift option that overlaps.

Even though I'm a night person, 5 is a common time to wake up for enough people who presumably want to be productive, and the benefit of getting off work before the school day ends has to be enticing. And on the second shift side of things, they get to have lunch with loved ones before going to work, and 11 is early enough that they could potentially go out for drinks or other fun before bed.

It's also nice that for either shift, the person has time to run errands at a time when most stores are open and activity levels are low.

[-] Venat0r@lemmy.world 0 points 7 months ago

The machines would wear out faster with more usage, so using them longer each day wouldn't help with that, but doing two shifts per day would increase productivity per machine than one shift per day. Which would also help pay off any loans for the machinery faster.

[-] RiderExMachina@lemmy.ml 8 points 7 months ago

This is why routine Preventative Maintenance is important. My job strives for World Class Manufacturing, so I hear all the manufacturing buzzwords all day everyday.

[-] bionicjoey@lemmy.ca 43 points 7 months ago

Often factories want to get the maximum use out of their equipment since it's very expensive and only lasts some finite number of years. Many factories run 24 hours a day in rotating shifts to minimize the downtime of their machinery.

[-] Usernameblankface@lemmy.world 13 points 7 months ago

Hmm, that explains running more than one shift, but does not explain starting at 5 am

[-] skydivekingair@lemmy.world 25 points 7 months ago

I used to work EMS 12 hour shifts 6-6. At one point management decided to stagger base start times. Some 6-6, others 7-7 & 8-8. So when someone flips their car and flies out at 5:45 they don’t have to wait for all the available service to finish their shift change, when the 8-8 team has 2 hours left they can get to the patient and back to base without extending their duty day too far.

Many of the workers who went 8-8 hated it. They complained nonstop about how it ruined their whole day since day shift they are headed out the door before the fam eats breakfast and get home after dinner. Same for night shift, rush through dinner or miss dinner and breakfast with the family.

Personally I enjoyed the 7-7/8-8 shifts more but enough people bitched enough they changed all but 1 base back to 6-6.

[-] Usernameblankface@lemmy.world 9 points 7 months ago

Huh. So it seems to me that when the job requires 12 hour shifts, the employees require at least one meal with their family, and the most common solution is to start early enough to let the employees make it home for dinner.

[-] SquiffSquiff@lemmy.world 10 points 7 months ago

Or be home in time for breakfast

[-] skydivekingair@lemmy.world 2 points 7 months ago

Yeah, not sure if I answered your question in regards to what you were thinking about but this specific scenario the 6am start time worked better for many of those with families.

[-] flying_sheep@lemmy.ml 2 points 7 months ago
[-] skydivekingair@lemmy.world 2 points 7 months ago

It’s like that for the most medical communities. Some nurses and docs spend a full week at the hospital. We were an air ambulance so the FAA limited us to 12 hour shifts but many ambulance, fire fighters etc. are 24-72 hour shifts.

[-] deegeese@sopuli.xyz 19 points 7 months ago

If they’re running 24hrs/day with 3 shifts, gives graveyard shift enough time to get home before their families wake up.

[-] morphballganon@lemmy.world 18 points 7 months ago

My old factory job was a 24h operation. Going 5-5 makes more sense than going 8-8 because managers that want to talk to both teams would rather stay until 6 than come in at 7.

[-] ryathal@sh.itjust.works 8 points 7 months ago

8-8 also makes doing anything outside of work nearly impossible on work days. You can generally find doctors, dentists, mechanics, etc. Open after 5, but finding them open before 8 is generally harder.

[-] Usernameblankface@lemmy.world 2 points 7 months ago

Ah, so it's about making the managers' jobs easier

[-] dmention7@lemm.ee 4 points 7 months ago

Not necessarily making them easier, but making it so that one shift worth of management and office/engineering staff can effectively support 2 manufacturing shifts.

The managers could come in at 5, but then they only have a couple hours at best to interface with 2nd shift

[-] key@lemmy.keychat.org 1 points 7 months ago

The factory ran 24/7 but managers were only there 9-5?

[-] morphballganon@lemmy.world 11 points 7 months ago

Yep. The highest station at night was the supervisor. If production went down, they'd call the manager about it.

[-] TheGreenGolem@lemmy.dbzer0.com 13 points 7 months ago

ITT: Half of the people doesn't understand what OP asks. The question is not why they start early, it's why specifically 5AM. Why not 5:30? Why not 4? What is the specific significance of 5AM?

[-] Ephera@lemmy.ml 10 points 7 months ago

I imagine, it doesn't help that this seems to be some regional thing that it's specifically 5 AM. Here in Germany, it seems to usually be 7 AM or so.

[-] Usernameblankface@lemmy.world 8 points 7 months ago

My thought is, why not 8am? Why not a variable start time to get the most productive 8 hours of each worker? Why push the start time so much earlier than the "9-5" that is such a regular part of the American vocabulary?

[-] Nemo@midwest.social 5 points 7 months ago

Because the buses start running at 4am.

[-] Usernameblankface@lemmy.world 6 points 7 months ago

In my opinion, it's the other way around. The busses run at 4 because thats when they're in demand, and they're in demand because of the time the factory expects the workers to show up.

[-] Toes@ani.social 4 points 7 months ago

Where I used to live the bus that took people to the industrial section of town only went there 3 times throughout the day.

It was particularly frustrating for me cause it was the only bus to take you remotely close to the courier's office to pickup a package. But its schedule appeared to be timed with the changes in shifts at the factory.

[-] Amazinghorse@lemmy.world 3 points 7 months ago

It's about money. Early start, early finish usually. But if overtime is needed, there is time in the day for it.

[-] intensely_human@lemm.ee 1 points 7 months ago

That doesn’t sound like it’s about money

[-] Grass@sh.itjust.works 3 points 7 months ago

I did 10 hour shifts 1 hour or 1 hour banked for a few years from 4am. The latest start time to avoid being stuck behind a 4 day long train and get home before traffic hits standstill for hours that worked for everyone that needed to be on site for the same shifts. Probably something similar I'd say because while the shifts were different in later jobs many featured seasonal meetings to discuss adjusting the shift times for the same reasons.

[-] TimewornTraveler@lemm.ee 3 points 7 months ago* (last edited 7 months ago)

My uninformed guess would be related to shipping and business hours. If they ship to businesses, then they gotta be up and running before their customers, right? I guess it depends on the industry but maybe the common practice where it is needed can carry over to where it's optional.

[-] Jonnynny@lemm.ee 3 points 7 months ago* (last edited 7 months ago)

I used to be an Operations Manager at a machine shop with 150 employees and a Program Manager at another places with 250 employees. Both had 5am starts. In my experience, the biggest factor was support for the billable staff. You have direct labor employees; these are the people who run machines and fabricate products. Then there are indirect employees that support the direct employees; like purchasing, planning/scheduling, management, customer service, quality, etc. Most manufacturers with a 5am start time are running multiple shifts of direct labor. The indirect employees usually don't start until 7-8am and overlap both shifts to have some support for both day and night shift.

Manufacturers that run one shift(like my current job) usually start later. We start at 7am but allow people to flex their start time for kids, etc.

[-] Nollij@sopuli.xyz 2 points 7 months ago

This must be a regional thing. In my area, most places like that run from 7-3:30. I did see a place that ran an area from 5-1:30, but that was specifically during the summer months to avoid the heat.

[-] AnneBonny@lemmy.dbzer0.com -4 points 7 months ago

I would guess that you have to run the air conditioner less if you get to work earlier.

[-] Usernameblankface@lemmy.world 2 points 7 months ago

If it's a day shift only type of place, that would make sense to me

[-] AnneBonny@lemmy.dbzer0.com 1 points 7 months ago
[-] Usernameblankface@lemmy.world 1 points 7 months ago

Fair enough. I did ask for opinions, so nothing wrong with guessing as a response

[-] AnneBonny@lemmy.dbzer0.com 3 points 7 months ago

I'm sorry I didn't have a better response.

lol

[-] neptune@dmv.social 1 points 7 months ago

One place I worked had only one shift and it was about 7am til three. Wrapping up at the hottest part of the day.

this post was submitted on 29 Dec 2023
89 points (95.9% liked)

Ask Lemmy

25937 readers
1993 users here now

A Fediverse community for open-ended, thought provoking questions


Rules: (interactive)


1) Be nice and; have funDoxxing, trolling, sealioning, racism, and toxicity are not welcomed in AskLemmy. Remember what your mother said: if you can't say something nice, don't say anything at all. In addition, the site-wide Lemmy.world terms of service also apply here. Please familiarize yourself with them


2) All posts must end with a '?'This is sort of like Jeopardy. Please phrase all post titles in the form of a proper question ending with ?


3) No spamPlease do not flood the community with nonsense. Actual suspected spammers will be banned on site. No astroturfing.


4) NSFW is okay, within reasonJust remember to tag posts with either a content warning or a [NSFW] tag. Overtly sexual posts are not allowed, please direct them to either !asklemmyafterdark@lemmy.world or !asklemmynsfw@lemmynsfw.com. NSFW comments should be restricted to posts tagged [NSFW].


5) This is not a support community.
It is not a place for 'how do I?', type questions. If you have any questions regarding the site itself or would like to report a community, please direct them to Lemmy.world Support or email info@lemmy.world. For other questions check our partnered communities list, or use the search function.


Reminder: The terms of service apply here too.

Partnered Communities:

Tech Support

No Stupid Questions

You Should Know

Reddit

Jokes

Ask Ouija


Logo design credit goes to: tubbadu


founded 1 year ago
MODERATORS