875
submitted 2 months ago by return2ozma@lemmy.world to c/news@lemmy.world
you are viewing a single comment's thread
view the rest of the comments
[-] tal@lemmy.today 8 points 2 months ago

I mean, Mississippi probably is a good place to put things if you're looking for low labor costs and need to be in the US anyway, even without negotiating a tax break.

I'm not sure that it's the best place to put datacenters, though, which is what this appears to be. Mississippi's got a warm climate, and datacenters tend to need to spend on cooling.

googles

https://dataspan.com/blog/data-center-cooling-costs/

How much does it cost to cool a data center? A cooling system is one of the most expensive parts of any data center.  According to research, anywhere between 30% to 55% of a data center’s energy consumption goes into powering its cooling and ventilation systems — with the average hovering around 40%.

[-] AA5B@lemmy.world 4 points 2 months ago

Surprisingly, fifth per capita in renewable energy

I didn’t find rankings per state on the cost per KwH in the time I spent looking, but Mississippi rates are about one/third what we pay in Massachusetts

So, yeah, good deal for Amazon.

[-] n3m37h@lemmy.dbzer0.com 1 points 2 months ago

Not to mention all that sweet electricity y'all buy from us Canadians, or is that just NY?

[-] shalafi@lemmy.world 3 points 2 months ago

Mississippi is the very definition of geologically stable. Weather events are rare enough. Tornados aren't much of a thing. Katrina levelled Gulfport like a nuclear bomb but go as far as Hattiesburg and there were only a few shingles blown off.

As for cooling, water is plentiful.

[-] Riven@lemmy.dbzer0.com 1 points 2 months ago

That's interesting. I wonder if there's more data centers in colder areas that take advantage of the local weather to cool.

[-] LordCrom@lemmy.world 1 points 2 months ago

Don't forget hurricanes.

[-] ryathal@sh.itjust.works 1 points 2 months ago

You get the Mississippi River though, which can help with both cooling and clean power.

[-] tal@lemmy.today 4 points 2 months ago* (last edited 2 months ago)

That's a thought on the cooling. I don't know how much water-cooling datacenters is a thing, but I remember Google spending a while considering floating datacenters for that reason.

It looks like Madison County, where they're building it, isn't on the Mississippi, though.

https://en.wikipedia.org/wiki/Madison_County,_Mississippi

It does apparently have some smaller rivers, and maybe they could use those if they're doing water cooling.

I don't think that hydropower is a factor either. Apparently they're looking at it, but not on the Mississippi River, and are in fact the only state in the US to have no hydropower generation (at least as of 2021):

https://www.psc.ms.gov/sites/default/files/2021-08/FromtheDeskOfBB_HydropowerMissedOpportunityinMS.pdf

In terms of hydropower, according to this document from the Mississippi state government, as of 2021, Mississippi is the only US state to do zero hydropower generation. While there are conventional hydropower/hydroelectric facilities that are in nearly every state, one state sticks out as having zero generation from hydroelectric resources – Mississippi.

[-] guacupado@lemmy.world 1 points 2 months ago

If Los Lunas, NM can host a data center, anywhere in Mississippi can.

this post was submitted on 05 Apr 2024
875 points (98.9% liked)

News

21656 readers
6157 users here now

Welcome to the News community!

Rules:

1. Be civil


Attack the argument, not the person. No racism/sexism/bigotry. Good faith argumentation only. Trolling is uncivil and is grounds for removal and/or a community ban.


2. All posts should contain a source (url) that is as reliable and unbiased as possible and must only contain one link.


Obvious right or left wing sources will be removed at the mods discretion. We have an actively updated blocklist, which you can see here: https://lemmy.world/post/2246130 if you feel like any website is missing, contact the mods. Supporting links can be added in comments or posted seperately but not to the post body.


3. No bots, spam or self-promotion.


Only approved bots, which follow the guidelines for bots set by the instance, are allowed.


4. Post titles should be the same as the article used as source.


Posts which titles don’t match the source won’t be removed, but the autoMod will notify you, and if your title misrepresents the original article, the post will be deleted. If the site changed their headline, the bot might still contact you, just ignore it, we won’t delete your post.


5. Only recent news is allowed.


Posts must be news from the most recent 30 days.


6. All posts must be news articles.


No opinion pieces, Listicles, editorials or celebrity gossip is allowed. All posts will be judged on a case-by-case basis.


7. No duplicate posts.


If a source you used was already posted by someone else, the autoMod will leave a message. Please remove your post if the autoMod is correct. If the post that matches your post is very old, we refer you to rule 5.


8. Misinformation is prohibited.


Misinformation / propaganda is strictly prohibited. Any comment or post containing or linking to misinformation will be removed. If you feel that your post has been removed in error, credible sources must be provided.


9. No link shorteners.


The auto mod will contact you if a link shortener is detected, please delete your post if they are right.


10. Don't copy entire article in your post body


For copyright reasons, you are not allowed to copy an entire article into your post body. This is an instance wide rule, that is strictly enforced in this community.

founded 1 year ago
MODERATORS