As a result, Oracle is now required to provide cash collateral or a letter of credit in the astronomical sum of over $7 billion just to connect the building to the power grid, a setup whose ongoing maintenance will cost the company more than $100 million annually.
It's been positively infuriating to watch government bodies bend every fucking law for these companies at the expense of their constituents. I am glad that Wisconsin is telling them to put up or shut up.