The new world record has been set at the UK-based JET laboratory.

The result came from the lab's final experiment after more than 40 years of fusion research.

The experiments produced 69 megajoules of energy over five seconds. That is only enough energy for four to five hot baths - so not a lot.

It is clear we are still a long way off from nuclear fusion power plants, but with every experiment it is bringing us one step closer.

you are viewing a single comment's thread
view the rest of the comments
[-] FaceDeer@kbin.social 12 points 9 months ago

I have to throw a little water on the "clean" part of the claim, unfortunately. JET does deuterium/tritium fusion, which produces neutron radiation that causes the lining of the reactor to become radioactive. The lining needs to be replaced every once in a while, producing nuclear waste.

[-] heckypecky@lemmy.dbzer0.com 14 points 9 months ago

While true, that is misleading. The nuclear waste produced will be radioactive for some decades, in contrast to the waste products from nuclear fission, which stay radioactive virtually forever. Most people think of fission waste if you don't specify and thus make fusion waste far scarier than it actually is.

[-] FaceDeer@kbin.social 5 points 9 months ago

Most nuclear fission products don't remain radioactive for long periods either, let alone "virtually forever." Bear in mind that the longer-lived a radioisotope is, the less radioactive it is.

For JET, I dug up the actual numbers (LLW is low-level waste and ILW is intermediate-level waste):

Radioactive wastes arising from operation and decommissioning of the JET experimental nuclear fusion reactor, located at Culham, are already factored into the UK radioactive waste inventory. Forecast LLW and ILW packaged volumes are 4,120 m^3 and 480 m^3, respectively; activated steels and alloy plant and equipment, including the JET vacuum vessel, are a major contributor to the ILW arising.

According to this page a typical 1-gigawatt fission reactor produces 3 m^3 of high-level waste per year, 7 m^3 of intermediate-level waste, and 90 m^3 of low-level waste per year while operating.

I'm having trouble finding easily comparable numbers for the wastes produced during decommissioning, this page had a lot of detail but was focused more on the area of land that needed to be sealed off rather than the cubic meters of material contained there. It does talk about the mass of some of the turbines being considered as low-level waste being in the range of a few hundred tons, which isn't much.

It's true that spent fission fuel rods are high level waste, but the total volume of that is quite small and it's in a very manageable form. So overall, I'm not really sure there's going to be a big improvement on nuclear waste production with fusion power. It's certainly not going to be a panacea, we're still going to need nuclear waste repositories and still be dealing with processing and sequestering large amounts of materials there.

[-] knfrmity@lemmygrad.ml 2 points 9 months ago

All told maybe a few hundred kilograms of waste every decade. A small price to pay, and certainly orders of magnitude less waste than currently used fossil and renewable electricity generation technology.

this post was submitted on 09 Feb 2024
77 points (96.4% liked)

Science

13160 readers
15 users here now

Subscribe to see new publications and popular science coverage of current research on your homepage


founded 5 years ago
MODERATORS