10
submitted 11 months ago by CMDR_Horn@lemmy.ml to c/woodworking@lemmy.ca

Hey everyone, I’m putting Rubio on some Hickory shelves and finished the bottoms yesterday at about 8pm. How long do I have to wait before I can flip them over and do the tops? Only planning a single coat.

Everything I see says 24 hours between coats, or things of that nature, but I’d just be flipping them over on my horses. I’m hoping to avoid waiting 6 more before moving forward.

you are viewing a single comment's thread
view the rest of the comments
[-] noodohs@ttrpg.network 2 points 11 months ago

Honestly, if you have the little pins or something similar to set them on, I'd just do all sides at once and be done with it. Set it bottom side down on the pins and then it doesn't matter if there are tiny little defects.

this post was submitted on 19 Nov 2023
10 points (100.0% liked)

Woodworking

6120 readers
1 users here now

A handmade home for woodworkers and admirers of woodworkers. Our community icon is a planter box made by @Captain Aggravated, the winner of our summer '24 woodworking contest. Congratulations!

founded 1 year ago
MODERATORS