United Kingdom
General community for news/discussion in the UK.
Less serious posts should go in !casualuk@feddit.uk or !andfinally@feddit.uk
More serious politics should go in !uk_politics@feddit.uk.
Try not to spam the same link to multiple feddit.uk communities.
Pick the most appropriate, and put it there.
Posts should be related to UK-centric news, and should be either a link to a reputable source, or a text post on this community.
Opinion pieces are also allowed, provided they are not misleading/misrepresented/drivel, and have proper sources.
If you think "reputable news source" needs some definition, by all means start a meta thread.
Posts should be manually submitted, not by bot. Link titles should not be editorialised.
Disappointing comments will generally be left to fester in ratio, outright horrible comments will be removed.
Message the mods if you feel something really should be removed, or if a user seems to have a pattern of awful comments.
view the rest of the comments
What's the point in battery powered trains? They will be a lot heavier and more expensive (per train) than electric trains that are connected to the grid through over track cables, which we already have in a lot of places.
I get it's likely faster to get going, since you don't need as much infrastructure. But it really seems like a short term solution.
They're excellent at replacing diesel units on lines where electrification is beyond economic viability.
There's not really a down side that makes them a short term solution.
The weight isn't really an issue as you get a lot of the energy returned, and these units still aren't pushing the axle loading of freight locomotives.
The train lines between Manchester - Leeds & York go over the Pennines with lots of very old, very long tunnels. The cost to electrify those lines probably doesn't make it worth it. Maybe they could partially electrify it closer to Manchester & Leeds which would require smaller and lighter batteries.
You can view the line on this drivers cab video from Manchester to York.
The route is being electrified as part of the Transpennine Route Upgrade, should be finished in 15 years or so.