this post was submitted on 05 Oct 2026
191 points (99.5% liked)

Technology

88590 readers
3472 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 3 years ago
MODERATORS
top 12 comments
sorted by: hot top controversial new old
[–] blueworld@piefed.world 34 points 11 hours ago (2 children)

interesting is that they are getting over 100 million in refunds, while using so much electricity and water which the state is essentially subsidizing.

Agate LLC reports expecting a refund of $55,822,472 from 2025 taxes. Fireball LLC is expecting a refund of $39,171,573.39 from 2025 taxes. Westwood Solutions LLC, the Google-owned data center in Omaha, is expecting a refund of $22,558,881 from 2025 taxes.

[–] bridgeenjoyer@sh.itjust.works 3 points 5 hours ago

Amazing how something that creates literally nothing can make so much money. Well it creates pain and suffering I guess. Worth it.

[–] tempest@lemmy.ca 6 points 7 hours ago

That's like 1 million per job created! A steal for sure!

[–] monketman82@lemmy.world 56 points 13 hours ago (4 children)

Agate LLC is reporting 52.65 megawatts of electricity during peak electrical demand and 13.299 megagallons of water between cooling towers, evaporative systems and site operations in the last year.

That totals out to 13 million gallons of water.

[–] abcdqfr@lemmy.world 11 points 7 hours ago
Metric Reported figure Time basis Safe interpretation
Agate LLC / Google Lincoln electricity 52.65 MW peak electrical demand Peak power, not annual energy consumption
Agate LLC / Google Lincoln water 13.299 million gal past year 13.299 Mgal/year
Six Nebraska data centers, combined water 765 million gal past year 765 Mgal/year
Fireball Group / Google Papillion water 547.88 million gal 2025 annual consumption 547.88 Mgal/year
[–] Soulphite@reddthat.com 30 points 11 hours ago

Ah, these are the fuckers that believe no one has a "right" to fresh water supply?

[–] bridgeenjoyer@sh.itjust.works 1 points 6 hours ago

What were the values they lied it would be when it was built? I'd like to know how bad it really is since its all a secret.

[–] fonix232@lemmy.world 0 points 7 hours ago (4 children)

53 megawatts "during peak electrical demand" or "last year"?

Because timespans matter. 53 megawatts is the rough average annual power consumption of 5 households. So if that's the datacenter's annual power usage... they're not using that much power after all. On the other hand, if that's the monthly usage, that's more in line with compute/data center usage. And if it's daily use... 😬

Same with the water. 13 million gallons is about 260 thousand bathtubs worth of water. That's basically what a town of ~300k will use in one night for bathing only. So for annual usage it's not that bad. For monthly usage it's passable. For daily usage... again 😬

[–] wonderingwanderer@sopuli.xyz 11 points 7 hours ago

You're thinking of MWh, this is MW.

Meaning at a given moment of peak usage, it's drawing that many MW. If it draws that much for 1 hour, then it consumed that many MWh.

A year's worth of 5 households' power consumption is one hour of peak operation is pretty bad...

[–] StaticallyLazy@lemmy.blahaj.zone 3 points 7 hours ago* (last edited 7 hours ago)

You'll need to give me a source for those numbers. My 1,300 square foot house has a 200 ampere main breaker, so I can't draw more than about 0.024 megawatts. It would therefore take more than two thousand similar-sized houses to draw 53 megawatts—and that's only at full power draw, which I never come remotely close to.

Also it's worth mentioning that timespans don't actually matter here: monthly usage and annual usage are the same number when dealing with watts. When a source says "average annual power consumption", they likely mean that the power measurement is averaged throughout the year and that hot/cold seasons are accounted for.

If you wanted to do math involving time, you would need to use watt-hours (or kWh, MWh, etc.), for which time is a factor. For example, if you drew a constant rate of 1 kilowatt for a full day, you would have 24 hours * 1 kilowatt = 24 kilowatt-hours.

[–] abcdqfr@lemmy.world 2 points 7 hours ago

That MW figure has no timescale. it is a peak metric from one instant. 53 MW for one second = ~0.015 kWh 53 MW for one hour = ~53 MWh 53 MW continuously for one day = ~1.26 GWh 53 MW continuously for one year = ~462 GWh There is no guessing as to how often that one datacenter operates at peak power consumption.

[–] nomecks@lemmy.wtf 1 points 7 hours ago

53Mw constant utilization is a small datacenter in AI terms