this post was submitted on 03 Aug 2026
209 points (99.1% liked)

Technology

86864 readers
3258 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 3 years ago
MODERATORS
 

A particularly surprising discovery is that CXMT is constructing its cleanrooms—where the actual silicon is produced—in just around 12 months, whereas the rest of the DRAM manufacturing industry typically takes 21-24 months, nearly a full year longer.

Finally, the report notes that the Chinese government is encouraging CXMT to transfer its DRAM technology IP to other Chinese DRAM manufacturers such as JHICC, Swaysure, and YTMC's subsidiary XMC. This initiative aims to alleviate memory shortages domestically before CAMT-designed DRAM enters other markets, such as the EU and possibly even the U.S.

you are viewing a single comment's thread
view the rest of the comments
[–] Abyssian@lemmy.world 4 points 19 hours ago (1 children)

"CXMT is projected to produce about 350,000 DRAM wafers per month by the end of 2026, assuming all current projects are completed on schedule."

This is a small blurb on a random tech site, it's just giving a simple 'if all goes well' projection.

I'm sure they're not setting the entire undertaking up so that if one thing ends up slightly delayed everyone's heads will explode. It seems likely that they also have projections that take varying delays with varying parts and numbers of parts of the project into account, but that someone writing a small blurb on a tech site isn't really privy to the entirety of their forecasting.

I don't think they need you to rush in and save them from their folly.

[–] textik@sh.itjust.works 3 points 19 hours ago (1 children)

Why would you assume any of that? If there is one constant in large-scale engineering projects, it is project managers over-promising on what their teams can deliver. In this case, they are promising a miracle salvation from the global DRAM shortage, so a measure of scepticism is, I believe, warranted.

[–] Abyssian@lemmy.world 1 points 11 hours ago

Everything, everywhere, doesn't always happen as it does in your frame of reference and experience. I find it unlikely that you're genuinely an expert in engineering projects of this sort and specifically in exactly how they're undertaken in China with large scale government support.