this post was submitted on 05 Feb 2026
297 points (99.0% liked)
Oddly Satisfying
3937 readers
37 users here now
If you like to become a mod in this community, kindly PM the mod.
Things that are strangely gratifying and inexplicably pleasurable.
Rules
- Be respectful and inclusive.
- No harassment, hate speech, or trolling.
- Engage in constructive discussions.
- Share relevant content.
- Follow guidelines and moderators' instructions.
- Use appropriate language and tone.
- Report violations.
- Foster a continuous learning environment.
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
The red lines are the spaces where the people that build the walls might drill, it's that dense because behinde me in that picture there are 3 rooms with together 6 loops and in the middle left behind the wall is the manifold
Doesn’t this require extra distribution box back there to reduce density of pipes in the hallway?
The hallway itself doesn't has a loop on it's own so we heat it with the entrance pipes of the different rooms