combomeal

joined 3 weeks ago
[–] combomeal@lemmy.zip 1 points 4 days ago

Thank you! I appreciate the kind words.

[–] combomeal@lemmy.zip 3 points 4 days ago (1 children)

What a bonding experience lol. Very cool. That’s a lot work going from a crawl space to a basement.

[–] combomeal@lemmy.zip 8 points 4 days ago

I haven’t taken a better pic of the basement with floor poured. But you get the idea.

[–] combomeal@lemmy.zip 5 points 5 days ago

After World War II a lot of the soldier came back looking for work and many of them dug out the crawl spaces in our area plus added the shelf foundation. This is according to my father in law. I trust him but I haven’t looked into it further to confirm.

[–] combomeal@lemmy.zip 2 points 5 days ago

Yes. I’ll post them once I have a minute to find them.

[–] combomeal@lemmy.zip 1 points 5 days ago

I did wear a mask most of the time. But beyond that I didn’t give it much thought. I probably should have.

[–] combomeal@lemmy.zip 3 points 5 days ago

I had a family memeber that wanted me to do something similar. I ended up just getting started with the bucket thing and got into a groove. There definitely smarter ways to do this.

[–] combomeal@lemmy.zip 2 points 5 days ago (2 children)

I did get a couple quotes. One was 20k the other somewhere around 30k. I knew going in we didn’t have the funds for foundation work plus excavation. I ended up spending 2500 for a dumpster drop off/pick up. This was a weekly event.

[–] combomeal@lemmy.zip 4 points 5 days ago (3 children)

Not a single one failed me. 26 total.

[–] combomeal@lemmy.zip 22 points 5 days ago (6 children)

It originally had a shelf foundation which took up a large amount of space as the shelf comes inward and eats useable space. The shelf was removed and we did foundation underpinning.

The windows are now two ft higher. It hasn’t been something we are bothered by.

193
submitted 5 days ago* (last edited 4 days ago) by combomeal@lemmy.zip to c/dull_mens_club@lemmy.world
 

House built in 1922 with less than 6 ft ceilings. Dug out 100,000 lbs of material and hauled it off in buckets. Took me about 3 months. Now we have 8ft ceilings. Foundation work handled by professional with proper permits.

** progress pics in the replies.

[–] combomeal@lemmy.zip 3 points 1 week ago

It was so obvious

view more: next ›