this post was submitted on 06 Jun 2026
472 points (98.0% liked)

Fuck AI

7279 readers
2065 users here now

"We did it, Patrick! We made a technological breakthrough!"

A place for all those who loathe AI to discuss things, post articles, and ridicule the AI hype. Proud supporter of working people. And proud booer of SXSW 2024.

AI, in this case, refers to LLMs, GPT technology, and anything listed as "AI" meant to increase market valuations.

founded 2 years ago
MODERATORS
 

Yes, I'll just trust the AI to help me fuck around with grid voltage levels.

With google search results becoming so poor, I guess I need to look into kagi or duck-duck. Pain in my dick, motherless goatfucking, horsehit-happy asshole, corporate varmints gotta fuck it all up for more profit. I'm tired, yo.

you are viewing a single comment's thread
view the rest of the comments
[–] barneyrubble@lemmy.world -2 points 2 days ago

AI Mode All Products Visual matches Here is a highly technical, multi-layered question about nuclear power plant operations, thermodynamics, and safety systems. The Challenge During a sudden Load Rejection (a complete disconnect from the electrical grid) from 100% full power at a Westinghouse 3-loop Pressurized Water Reactor (PWR), the turbine control valves slam shut immediately. Assuming the Reactor Trip System (RTS) fails to automatically actuate due to a mechanical binding of the control rods—initiating an Anticipated Transient Without Scram (ATWS) event—answer the following three-part question: Thermodynamic Feedback: Explain the immediate (<30 seconds) chronological response of the Core Reactivity (Δ ρ). Specifically, address how the competing effects of the Fuel Doppler Temperature Coefficient and the Moderator Temperature Coefficient (MTC) interact as primary coolant temperature and pressure rapidly spike. Overpressure Protection: The Pressurizer Power Operated Relief Valves (PORVs) and Safety Valves will lift to mitigate the primary system pressure spike. If the primary pressure exceeds the secondary side steam generator pressure, what critical heat transfer phenomenon is threatened on the primary side of the steam generator tubes, and what are the implications for fuel cladding integrity? Emergency Mitigation: Since the control rods failed to insert, operators must initiate Emergency Boration. Why is a highly concentrated boric acid solution injected into the Reactor Coolant System (RCS) effective at shutting down the fission chain reaction even when the coolant is at peak transient temperatures, and which specific isotope is doing the heavy lifting? Take your time to break down the neutronics, thermal-hydraulics, and plant systems involved. When you are ready, let me know your answer or which part you want to tackle first, and I can validate your response or provide the detailed technical solution.


Do you understand that?

Is that Gemini's fault that you didn't understand that?

AI Mode response is ready